SKU
JOULE Clip & Rail - Solid Floor System UFH Floor Panel
by JOULE
This is the most common system installed in new build properties where the floor is being laid is a screed solution.
The installer simply covers the insulation boards with polyurethane sheets, removes the sticky cover on the back of the rapid rails and then lays them out parallel to one of the walls keeping one meter between each row.
They then lay the pipe down onto the surface clipping it to the rails as it passes over the rails in a configuration detailed in the installation instructions provided.
16MM PERT/AL/PERT | SOLID FLOOR SYSTEM | 70MM | 90 w/m2 |